Structural
Sydney Tower Commercial Complex
Comprehensive structural assessment and reinforcement design for a 42-storey mixed-use development in Sydney CBD.
Explore our portfolio of innovative structural, civil, and M&E projects across Australia. Every project demonstrates our commitment to precision, safety, and real-world impact.
Comprehensive engineering solutions delivered across diverse sectors and scales. Browse our complete collection of structural, civil, and M&E projects.
Structural
Comprehensive structural assessment and reinforcement design for a 42-storey mixed-use development in Sydney CBD.
Civil
Design and construction management for a 180m steel arch pedestrian bridge connecting the CBD to Southbank precinct.
M&E
Complete mechanical and electrical systems design for a 25,000m² innovation and technology hub.
Structural
Structural engineering design for three 28-storey residential towers with podium parking and retail space.
Civil
Civil engineering design for 8.5km highway upgrade including three interchanges and drainage infrastructure.
Structural
Structural design for expansive glass and steel atrium spanning 45m with intricate lattice roof system.
Civil
Multi-modal transport interchange design integrating bus, light rail, and bicycle infrastructure.
M&E
Advanced HVAC, electrical, and laboratory systems design for cutting-edge biotechnology research centre.
Showcasing the diversity and technical excellence across our major project deliveries
420m main span with innovative cable configuration reducing construction time by 6 months
High-capacity storage silos designed to withstand extreme seismic and wind loading
Complex multi-phase development delivered on-time with zero safety incidents
Integrated building automation achieving 45% energy reduction versus baseline
Detailed case studies showcasing our technical approach, challenges overcome, and measurable outcomes
Structural
Design and certification of a 280m post-tensioned concrete bridge spanning the Brisbane River, connecting northern suburbs to the CBD. Project required innovative foundation solutions due to challenging riverbed conditions.
Variable subsurface geology and stringent flood immunity requirements necessitated deep piled foundations extending 45m below river level, designed to resist 1-in-500-year flood event loads.
Delivered 2 months ahead of schedule with 12% cost savings through optimized prestressing design. Bridge achieved 150-year design life with minimal maintenance requirements.
Civil
Master planning and civil engineering design for a 85-hectare industrial and logistics estate including roads, drainage, services, and environmental management infrastructure.
Sensitive environmental zone requiring comprehensive stormwater quality treatment and erosion control measures while maintaining development viability and staged construction flexibility.
Approved on first submission with no conditions. Stormwater treatment system exceeded regulatory requirements by 25%, establishing new benchmark for industrial development in Tasmania.
M&E
Mechanical, electrical, fire protection, and medical gas systems design for a new 8-storey clinical services wing including operating theatres, intensive care units, and diagnostic imaging facilities.
Integration with existing hospital infrastructure while maintaining operational continuity. Critical systems required 100% redundancy and seamless changeover capability during maintenance.
Zero downtime during cutover. Systems achieved 99.98% uptime in first operational year. Energy efficiency measures delivered 38% reduction in HVAC energy consumption versus code baseline.
Civil
Civil design for 42km highway upgrade including realignment, pavement strengthening, bridge replacement, and intersection improvements to improve freight efficiency and safety.
Maintaining traffic flow during construction on critical freight route while managing environmental constraints including threatened species habitat and cultural heritage sites.
Project completed without significant traffic delays. Safety improvements resulted in 65% reduction in crash rates in first 12 months post-opening. Environmental offset plantings exceeded required area by 15%.
Trusted feedback from industry leaders who have partnered with us on complex engineering projects
The Solution Is delivered exceptional structural engineering on our Sydney Tower project. Their innovative design solutions reduced steel tonnage by 18% without compromising safety, delivering significant cost savings and accelerating our construction timeline.
The civil engineering team at The Solution Is demonstrated outstanding technical capability on the Pacific Highway Extension. Their drainage design exceeded performance requirements while their proactive approach to environmental constraints ensured smooth approvals and delivery.
We engaged The Solution Is for M&E systems on our hospital expansion and their performance was exemplary. They delivered complex redundant systems that met stringent healthcare requirements, integrating seamlessly with existing infrastructure while maintaining full operational continuity.