Engineering technical drawings

Engineering Excellence Delivered

Explore our portfolio of innovative structural, civil, and M&E projects across Australia. Every project demonstrates our commitment to precision, safety, and real-world impact.

450+
Projects Delivered
98%
Client Satisfaction

Featured Engineering Achievements

Showcasing the diversity and technical excellence across our major project deliveries

Cable-stayed bridge
Civil Engineering

Gateway Cable-Stayed Bridge

420m main span with innovative cable configuration reducing construction time by 6 months

15,000 tonnes steel 150-year design life
Industrial concrete structures
Structural Engineering

Industrial Storage Terminal

High-capacity storage silos designed to withstand extreme seismic and wind loading

40m height 80,000m³ capacity
Construction site with cranes
Project Management

Waterfront Mixed-Use Precinct

Complex multi-phase development delivered on-time with zero safety incidents

$480M value 36-month timeline
Modern building architecture
M&E Systems

Smart Office Complex

Integrated building automation achieving 45% energy reduction versus baseline

6-Star Green rating IoT integration
450+
Projects Completed
Across structural, civil, and M&E disciplines since 2008
125,000
Tonnes of Steel Designed
Structural integrity verified to Australian Standards
8.5 months
Average Delivery Time
From design commencement to final certification
98.4%
Client Satisfaction Rate
Based on post-project surveys and repeat engagement
$2.8B
Total Project Value
Cumulative construction value of completed projects
Zero
Major Safety Incidents
Comprehensive safety record across all active projects

Project Deep Dive

Detailed case studies showcasing our technical approach, challenges overcome, and measurable outcomes

River bridge aerial view Structural

Brisbane River Crossing

Queensland Transport Authority 2022-2023

Overview

Design and certification of a 280m post-tensioned concrete bridge spanning the Brisbane River, connecting northern suburbs to the CBD. Project required innovative foundation solutions due to challenging riverbed conditions.

Key Challenge

Variable subsurface geology and stringent flood immunity requirements necessitated deep piled foundations extending 45m below river level, designed to resist 1-in-500-year flood event loads.

Scope Highlights

  • Full structural design and documentation
  • Geotechnical investigation coordination
  • Construction phase engineering support
  • Independent design verification and peer review

Outcomes

Delivered 2 months ahead of schedule with 12% cost savings through optimized prestressing design. Bridge achieved 150-year design life with minimal maintenance requirements.

Construction site aerial Civil

Industrial Estate Development

Hobart, Tasmania 2023-2024

Overview

Master planning and civil engineering design for a 85-hectare industrial and logistics estate including roads, drainage, services, and environmental management infrastructure.

Key Challenge

Sensitive environmental zone requiring comprehensive stormwater quality treatment and erosion control measures while maintaining development viability and staged construction flexibility.

Scope Highlights

  • Site-wide drainage and detention basin design
  • 14km of internal road network
  • Water, sewer, and electrical reticulation
  • Environmental impact assessment and approvals

Outcomes

Approved on first submission with no conditions. Stormwater treatment system exceeded regulatory requirements by 25%, establishing new benchmark for industrial development in Tasmania.

Construction crane silhouette M&E

Hospital Expansion Project

Perth Royal Hospital 2021-2023

Overview

Mechanical, electrical, fire protection, and medical gas systems design for a new 8-storey clinical services wing including operating theatres, intensive care units, and diagnostic imaging facilities.

Key Challenge

Integration with existing hospital infrastructure while maintaining operational continuity. Critical systems required 100% redundancy and seamless changeover capability during maintenance.

Scope Highlights

  • Dual-feed electrical distribution with automatic transfer
  • Precision HVAC for operating theatre environments
  • Medical gas reticulation and alarm systems
  • BMS integration with existing hospital controls

Outcomes

Zero downtime during cutover. Systems achieved 99.98% uptime in first operational year. Energy efficiency measures delivered 38% reduction in HVAC energy consumption versus code baseline.

Bridge construction site Civil

Regional Highway Upgrade

Mildura-Shepparton Corridor 2022-2024

Overview

Civil design for 42km highway upgrade including realignment, pavement strengthening, bridge replacement, and intersection improvements to improve freight efficiency and safety.

Key Challenge

Maintaining traffic flow during construction on critical freight route while managing environmental constraints including threatened species habitat and cultural heritage sites.

Scope Highlights

  • Detailed road geometric and pavement design
  • Four bridge replacements including 120m span structure
  • Traffic management and staging strategy
  • Environmental offset planning and implementation

Outcomes

Project completed without significant traffic delays. Safety improvements resulted in 65% reduction in crash rates in first 12 months post-opening. Environmental offset plantings exceeded required area by 15%.

Client Testimonials

Trusted feedback from industry leaders who have partnered with us on complex engineering projects

The Solution Is delivered exceptional structural engineering on our Sydney Tower project. Their innovative design solutions reduced steel tonnage by 18% without compromising safety, delivering significant cost savings and accelerating our construction timeline.

The civil engineering team at The Solution Is demonstrated outstanding technical capability on the Pacific Highway Extension. Their drainage design exceeded performance requirements while their proactive approach to environmental constraints ensured smooth approvals and delivery.

We engaged The Solution Is for M&E systems on our hospital expansion and their performance was exemplary. They delivered complex redundant systems that met stringent healthcare requirements, integrating seamlessly with existing infrastructure while maintaining full operational continuity.